
Jenkins Cabinet Project
3 weeks
Contained remediation with clearance documentation

Project type
Insurance Restoration & Water Mitigation
Size
Below-grade wall assembly
Timeline
2 weeks
Persistent moisture at a below-grade wall produced heavy surface growth. The area was contained, remediated, dried to verified readings, and rebuilt clean with documentation prepared for the carrier file.
Have a project in mind? Contact us.